Gurobi 5.0.1 (linux64) logging started Sat Nov 17 23:37:42 2012 Optimize a model with 1 rows, 18 columns and 18 nonzeros Model has 24 quadratic objective terms Presolve time: 0.00s Presolved: 25 rows, 42 columns, 90 nonzeros Variable types: 0 continuous, 42 integer (42 binary) Found heuristic solution: objective 12.0000000 Found heuristic solution: objective 7.0000000 Root relaxation: objective 0.000000e+00, 27 iterations, 0.00 seconds Nodes | Current Node | Objective Bounds | Work Expl Unexpl | Obj Depth IntInf | Incumbent BestBd Gap | It/Node Time 0 0 0.00000 0 11 7.00000 0.00000 100% - 0s H 0 0 6.0000000 0.00000 100% - 0s 0 0 0.00000 0 14 6.00000 0.00000 100% - 0s 0 0 0.00000 0 6 6.00000 0.00000 100% - 0s H 0 0 5.0000000 0.00000 100% - 0s 0 2 0.00000 0 6 5.00000 0.00000 100% - 0s * 68 12 5 4.0000000 1.00000 75.0% 3.9 0s Cutting planes: Cover: 44 Explored 84 nodes (452 simplex iterations) in 0.01 seconds Thread count was 1 (of 16 available processors) Optimal solution found (tolerance 1.00e-04) Best objective 4.000000000000e+00, best bound 4.000000000000e+00, gap 0.0%