Gurobi 5.0.1 (linux64) logging started Sat Nov 17 23:37:54 2012 Optimize a model with 1 rows, 22 columns and 22 nonzeros Model has 27 quadratic objective terms Presolve time: 0.00s Presolved: 28 rows, 49 columns, 103 nonzeros Variable types: 0 continuous, 49 integer (49 binary) Found heuristic solution: objective 11.0000000 Root relaxation: objective 0.000000e+00, 34 iterations, 0.00 seconds Nodes | Current Node | Objective Bounds | Work Expl Unexpl | Obj Depth IntInf | Incumbent BestBd Gap | It/Node Time 0 0 0.00000 0 4 11.00000 0.00000 100% - 0s H 0 0 4.0000000 0.00000 100% - 0s 0 0 0.00000 0 11 4.00000 0.00000 100% - 0s 0 0 0.00000 0 4 4.00000 0.00000 100% - 0s 0 0 0.00000 0 6 4.00000 0.00000 100% - 0s 0 0 0.00000 0 6 4.00000 0.00000 100% - 0s 0 0 0.00000 0 5 4.00000 0.00000 100% - 0s 0 2 0.00000 0 5 4.00000 0.00000 100% - 0s Cutting planes: Cover: 48 MIR: 3 Explored 95 nodes (574 simplex iterations) in 0.01 seconds Thread count was 1 (of 16 available processors) Optimal solution found (tolerance 1.00e-04) Best objective 4.000000000000e+00, best bound 4.000000000000e+00, gap 0.0%