Gurobi 5.0.1 (linux64) logging started Sat Nov 17 19:53:21 2012 Optimize a model with 1 rows, 19 columns and 19 nonzeros Model has 80 quadratic objective terms Modified 19 Q diagonals Presolve time: 0.01s Presolved: 1 rows, 19 columns, 19 nonzeros Presolved model has 99 quadratic objective terms Variable types: 0 continuous, 19 integer (19 binary) Found heuristic solution: objective 40.0000000 Root relaxation: objective 0.000000e+00, 20 iterations, 0.00 seconds Nodes | Current Node | Objective Bounds | Work Expl Unexpl | Obj Depth IntInf | Incumbent BestBd Gap | It/Node Time 0 0 0.00000 0 19 40.00000 0.00000 100% - 0s H 0 0 39.0000000 0.00000 100% - 0s H 0 0 37.0000000 0.00000 100% - 0s H 0 0 36.0000000 0.00000 100% - 0s H 0 0 32.0000000 0.00000 100% - 0s 0 2 2.11618 0 19 32.00000 2.11618 93.4% - 0s H 217 136 31.0000000 9.17422 70.4% 2.0 0s H 644 253 30.0000000 14.65827 51.1% 2.1 0s Explored 3590 nodes (7402 simplex iterations) in 0.16 seconds Thread count was 1 (of 16 available processors) Optimal solution found (tolerance 1.00e-04) Best objective 3.000000000000e+01, best bound 3.000000000000e+01, gap 0.0%