Gurobi 5.0.1 (linux64) logging started Sat Nov 17 19:54:05 2012 Optimize a model with 1 rows, 21 columns and 21 nonzeros Model has 99 quadratic objective terms Modified 21 Q diagonals Presolve time: 0.01s Presolved: 1 rows, 21 columns, 21 nonzeros Presolved model has 120 quadratic objective terms Variable types: 0 continuous, 21 integer (21 binary) Found heuristic solution: objective 51.0000000 Root relaxation: objective 0.000000e+00, 23 iterations, 0.00 seconds Nodes | Current Node | Objective Bounds | Work Expl Unexpl | Obj Depth IntInf | Incumbent BestBd Gap | It/Node Time 0 0 0.00000 0 21 51.00000 0.00000 100% - 0s H 0 0 50.0000000 0.00000 100% - 0s H 0 0 47.0000000 0.00000 100% - 0s H 0 0 43.0000000 0.00000 100% - 0s 0 2 2.85922 0 21 43.00000 2.85922 93.4% - 0s H 79 53 42.0000000 7.65376 81.8% 2.0 0s H 82 56 41.0000000 7.65376 81.3% 2.0 0s H 106 73 40.0000000 8.33634 79.2% 2.0 0s H 934 408 39.0000000 15.54059 60.2% 2.1 0s H 1541 399 38.0000000 20.58293 45.8% 2.1 0s Explored 11320 nodes (23253 simplex iterations) in 0.52 seconds Thread count was 1 (of 16 available processors) Optimal solution found (tolerance 1.00e-04) Best objective 3.800000000000e+01, best bound 3.800000000000e+01, gap 0.0%