Gurobi 5.0.1 (linux64) logging started Sat Nov 17 19:54:47 2012 Optimize a model with 1 rows, 22 columns and 22 nonzeros Model has 113 quadratic objective terms Modified 22 Q diagonals Presolve time: 0.01s Presolved: 1 rows, 22 columns, 22 nonzeros Presolved model has 135 quadratic objective terms Variable types: 0 continuous, 22 integer (22 binary) Found heuristic solution: objective 54.0000000 Root relaxation: objective 0.000000e+00, 24 iterations, 0.00 seconds Nodes | Current Node | Objective Bounds | Work Expl Unexpl | Obj Depth IntInf | Incumbent BestBd Gap | It/Node Time 0 0 0.00000 0 22 54.00000 0.00000 100% - 0s 0 2 2.86235 0 22 54.00000 2.86235 94.7% - 0s H 40 32 50.0000000 5.71730 88.6% 2.3 0s H 40 30 47.0000000 5.71730 87.8% 2.3 0s * 399 218 11 45.0000000 12.00968 73.3% 2.1 0s Explored 23269 nodes (49706 simplex iterations) in 1.27 seconds Thread count was 1 (of 16 available processors) Optimal solution found (tolerance 1.00e-04) Best objective 4.500000000000e+01, best bound 4.500000000000e+01, gap 0.0%