Results obtained using Gurobi for solving the Lot Sizing Problem, using the models described in Mathematical Optimization: Solving Problems using Python and Gurobi. Benchmark instances were generated with Trigeiro's method. CPU time limited to 3600 seconds. (Click on values for selecting data to display.)
Performance data | Factor: low | Factor: med | Factor: high |
CPU time required | [select] | [select] | [select] |
Number of solution failures | [select] | [select] | [select] |
Solutions | [select] | [select] | [select] |
Solutions failed
Label | Description |
std | standard model |
cut | standard model with cutting planes (single item lot sizing cuts; callback on MIPSOL and MIPNODE) |
fl | facility location formulation |